Procurement

The Wild Trout Trust delivers river habitat projects at a wide range of scales, from those using hand tools and volunteers up to major projects which involve contractors. From time to time we will issue Invitations to Tender which will be listed below. 

ProjectLocationServicesClose DateTender Documents 
Conjure Alders Fish PassagePerlethorpe, NottsFish pass constructionNOW CLOSED

Appendix 1 Detailed Design.
Appendix 2 CDM Risk Assessment.
Appendix 3 Buildability Statement.
Appendix 4 Ground Investigation.
Appendix 5 Bespoke Permit.
Appendix 6 FRAP Management System.

River Witham Flood Bank Removal Project.Manthorpe, Lincolnshire.Flood bank removal, floodplain lowering, gravel introduction.5pm Monday 6 September 2021.

Invitation to tender.
1.Design drawings.
2.Bill of quantities.
3.Method statement. 
4.Services check.
5.FRA permit.